x
Send Your Inquiry Today
Quick Quote
Investment Casting Quality Control

Investment Casting Quality Control

Why Can Pingheng Machinery Provide Precision Investment Castings with Stable Quality?

Since Pingheng Machinery is a one-stop investment casting manufacturer, we can control the whole investment casting process independently.

We have our own mold, Tools, and fixtures fabrication department. So we always designed and produced our own molds, tools, and fixtures ourselves. For some casting parts with extremely high precision requirements, we cooperate with our local professional mold factory. All to ensure complete control of all the critical dimensions of the final casting part.

We have an investment casting workshop, keep strict quality control from wax making to shape the rough casting, and each blank casting requires twice inspection.

We have a CNC machining and casting workshop. We will create a machining operation manual for each casting part before machining, and do a final casting inspection before shipment.

We can provide a chemical composition report, a size report, a heat treatment report, and a mechanical performance report for each batch.

  • Wax Injection Workshop
    Wax Injection Workshop
    • Employee self-inspection: Workshop director conducts 3-4 times daily random inspections 3-4 times every day.
    • Operation manual+Inspection manual+Point inspection record
    • Quality training weekly: Customer complaint point improvement training
  • Shell Making Workshop
    Shell Making Workshop
    • Place equipment and tools at dedicated locations
    • Record temperature, humidity, and slurry seconds regularly
    • Customize the shell-making process cards for different products.
  • CNC Machining Workshop
    CNC Machining Workshop
    • Operation manual+inspection manual inspection record made the machining processing operation more standard.
    • First time and final inspection + self-inspection
    • Adherence to the principle and ensuring the inspection at a standard level.
Production Quality Management

Smelting Workshop

Smelting Workshop
Smelting Workshop
  • Supervision and the use of a spectral analyzer are necessary before pouring. The record will be kept for 2 years for future tracing.
  • The melting process must be strictly carried out according to the parameters
Scroll to Top